I have one of my Seplos battery packs connected to my Sunsynk 8kW inverter but even though I set the inverter to charge at 150A (0.5C on a 304Ah pack) it seems like the BMS is restricting the actual charge to only 100A according to the BMS page on the inverter.
I've looked at the BMS settings but can't see anything which suggests this current limit is changeable so don't know why a 200A BMS is restricting the charge current. The only thing I did see was that there is a function switch in battery monitor for setting "Single BMS 1.0C Charging" but worried that it's the wrong thing to switch on.
Any thoughts?
I've looked at the BMS settings but can't see anything which suggests this current limit is changeable so don't know why a 200A BMS is restricting the charge current. The only thing I did see was that there is a function switch in battery monitor for setting "Single BMS 1.0C Charging" but worried that it's the wrong thing to switch on.
Any thoughts?