I am involved in installing a Sol-Ark 15k and we are rewiring the service entrance so that the Sol-Ark 15k is the point of grid interconnect. The Load output will go to the main breaker panel for now. All I want to do is have the power company pull the meter, kill the transformer, I will bring my new leads into the meter base, the Load to the main breaker panel, and turn the power back on. Sol-Ark configuration and commissioning I would like to do at a later date.
So will the Sol-Ark just pass through the grid power like it is not in the circuit, being off and without any commissioning steps?
Thanks in advance.
So will the Sol-Ark just pass through the grid power like it is not in the circuit, being off and without any commissioning steps?
Thanks in advance.