dmkjr
Solar Enthusiast
I have two 6000xp's on the way. I will be eliminating a defective 6500ex and replacing one more. From the literature, I do not see where it is clear on how to parallel the legs together from the two inverters. Meaning, each leg is 3,000w per inverter. So L1 from both inverters in parallel should be 6,000w at the same voltage. Do I need to combine on a bus bar before running to L1 of breaker box? Follow suit for L2? Am I over thinking this?
Thank you,
DK
Thank you,
DK