First and easiest strings will be a set of 5 or 6 on the SSW side of a barn right behind my house and another 5-6 on the top of the barn facing SSE. Then at some point I’ll pickup another RS450/100 and do a larger sized string ground mounted in the field about 40ft from the house.
Added this 250/85 to run my small 5 panel east facing string on top of the barn. The RS450/100 will run two 10 panel strings facing south. I probably will put those 20 panels on 5 Eg4 brightmount adjustable ground mounts.