What are people seeing for battery charge amps in their eg4 6500 inverters when in bms mode?
I have two inverters in parallel with 7 lifepower 4 batteries. I used to run a manual battery charging setting when I was having fault code 61 issues. In that setting I was running a 60a charging for each inverter. Now that the 61 code issue is resolved I would like to use the bms to control all of that, but the charges take a long time. The master inverter charges at 30a, and the slave inverter at 20a. Is there a way for me to increase the charge capacity, but still use the bms? Will doing that damage the batteries or shorten their life?
Thank you for your help.
I have two inverters in parallel with 7 lifepower 4 batteries. I used to run a manual battery charging setting when I was having fault code 61 issues. In that setting I was running a 60a charging for each inverter. Now that the 61 code issue is resolved I would like to use the bms to control all of that, but the charges take a long time. The master inverter charges at 30a, and the slave inverter at 20a. Is there a way for me to increase the charge capacity, but still use the bms? Will doing that damage the batteries or shorten their life?
Thank you for your help.