My order of 16pcs of 3.2v 280AH CATL cells from alibaba just got delivered to me in West Africa - Ghana.
I decided to order from Shelly Fang (Shenzhen Jidian Technology Co., Ltd).
Took roughly 3 months. Packaging is very good. cells looks to be in very good condition.
I checked the individual voltages and apart from two of them that read 3.18v and 3.20v, the rest read 3.19v
My question is can I just assemble them with a BMS and start using the cells or i should connect them in parallel leave them to sit for a while to balance?
I decided to order from Shelly Fang (Shenzhen Jidian Technology Co., Ltd).
Took roughly 3 months. Packaging is very good. cells looks to be in very good condition.
I checked the individual voltages and apart from two of them that read 3.18v and 3.20v, the rest read 3.19v
My question is can I just assemble them with a BMS and start using the cells or i should connect them in parallel leave them to sit for a while to balance?