littleharbor2
Solar Addict
The leading panel will be set back about 4 feet from the leading edge. And, I'm going to use these sorts of plastic mounting brackets for the leading panel:
If you can fabricate an air dam on the front edge of the front panel to divert the oncoming air over the panel you alleviate the lift which is so dangerous.