Picking up panels tomorrow and getting ready for as close as code compliant as possible. My area in NC has some interesting rules. Anyway question about RSD and PV Disconnect. Here is my wire path:
Panel->Tigo->PV Cable->Soladeck->DC Terminal Block->Flex Conduit 90° THHN routed through attic and down outside of the house (assume need to tradition to solid MC to a PV Disconnect near meter->Solid MC through brick into walls/house to Inverter (Sol-Ark) in garage.
To comply with RSD button by meter, where does the Sol-ark/Tigo RSD switch fit into the mix? If the PV switch is turned off first, can the Sol-Ark or other signal the shutdown on each Tigo at the panel?
Panel->Tigo->PV Cable->Soladeck->DC Terminal Block->Flex Conduit 90° THHN routed through attic and down outside of the house (assume need to tradition to solid MC to a PV Disconnect near meter->Solid MC through brick into walls/house to Inverter (Sol-Ark) in garage.
To comply with RSD button by meter, where does the Sol-ark/Tigo RSD switch fit into the mix? If the PV switch is turned off first, can the Sol-Ark or other signal the shutdown on each Tigo at the panel?
Last edited: