DefyTheGrid
New Member
Howdy all, Let's say I have 16 solar panels, but 4 of the panels need to go on the side (verticle) of the shop. In a 4s2p system (lv6548 inverter with two inputs), is that an ok thing to do without systemic future problems? In July, the side of the shop will not get any sun.
Explained another way
Series 1: 4 panels -> Parallel to lv6548
Series 2: 4 panels
Series 3: 4 panels -> Parallel to lv6548
Series 4: 4 panels (this series is on side of shop)
Is there anything wrong with this?
Explained another way
Series 1: 4 panels -> Parallel to lv6548
Series 2: 4 panels
Series 3: 4 panels -> Parallel to lv6548
Series 4: 4 panels (this series is on side of shop)
Is there anything wrong with this?