RoadTurtle
Solar Enthusiast
- Joined
- Mar 30, 2022
- Messages
- 367
I'd think this wouldn't be this difficult...
I "think" I need either 4 port unit, or a 2 (or 4) port gland to run the wires through. Two sets of wires, each coming off three 24V 200 watt panels. going to two SCC. Found a set of glands on Amazon, ship between Feb 3rd to Mar 3rd.
Trailer did come with Zamp and their ridiculous SAE connector, which is rated for 20A each. Obviously this would be the easy way out and not the best solution.
Is there a well equipped solar parts store that might have either 4 port inlet or a have 2 wire gland? Is there an issue with 4 wire 10g wire gland?
I "think" I need either 4 port unit, or a 2 (or 4) port gland to run the wires through. Two sets of wires, each coming off three 24V 200 watt panels. going to two SCC. Found a set of glands on Amazon, ship between Feb 3rd to Mar 3rd.
Trailer did come with Zamp and their ridiculous SAE connector, which is rated for 20A each. Obviously this would be the easy way out and not the best solution.
Is there a well equipped solar parts store that might have either 4 port inlet or a have 2 wire gland? Is there an issue with 4 wire 10g wire gland?