I recently installed a Solar plant that has a total capacity of 6.5KW and has 12 longi panels attached to it.
The issue I'm facing is the solar plant production isn't crossing the half way mark that is 3.25KW. It stays there for about 2-3 hours which is peak production and then it comes back. It's winter here so most of the other plants I checked are also producing around 50-55% of total capacity.
Thing is I recently found out that my 6KW inverter has 2 MPPT and all the 12 panels I've are attached to the PV1 and PV2 is empty(could be seen in the picture) I was just wondering if this could be because of that?
The issue I'm facing is the solar plant production isn't crossing the half way mark that is 3.25KW. It stays there for about 2-3 hours which is peak production and then it comes back. It's winter here so most of the other plants I checked are also producing around 50-55% of total capacity.
Thing is I recently found out that my 6KW inverter has 2 MPPT and all the 12 panels I've are attached to the PV1 and PV2 is empty(could be seen in the picture) I was just wondering if this could be because of that?