Is wire size and fuse calculated based on the Continuous Power specifications (2000 W renogy pure sine), or the Peak Surge, which is 4000 W, listed in the specs.?
Im assuming that the same size wire would also be used to connect the batteries together? (2 renogy 100 Ahr LiFePo4 in parallel)
What is best practice, to go directly to the inverter, or to a bus bar that will also be used for distribution to a DC fuse block.