Hey everyone,
First off i am modeling my system off of the 400 watt 12v system except im using 1 x 300 watt panel instead on 4 x100 watt panels. But otherwise im running 40 amp mppt charge controller, 100 ah lithium iron phosphate battery, 1200 watt inverter, and the blue sea fuse block.
Which is where my question comes in.
In this system should there be another fuse involved between the 100-200 amp fuse (mine is 175 amp) off the main before the inverter and the blue sea fuse block? The fuse block says max input should be 125 amps. So shouldn't there be another 120-125amp fuse before the 12 v fuse block? If not can someone explain.
First off i am modeling my system off of the 400 watt 12v system except im using 1 x 300 watt panel instead on 4 x100 watt panels. But otherwise im running 40 amp mppt charge controller, 100 ah lithium iron phosphate battery, 1200 watt inverter, and the blue sea fuse block.
Which is where my question comes in.
In this system should there be another fuse involved between the 100-200 amp fuse (mine is 175 amp) off the main before the inverter and the blue sea fuse block? The fuse block says max input should be 125 amps. So shouldn't there be another 120-125amp fuse before the 12 v fuse block? If not can someone explain.