I have 2 systems I'm currently setting up for small businesses in Belize. Both system are almost identical (only battery size changes) OFF-GRID configurations.
![1684252788060.png 1684252788060.png](https://diysolarforum.com/data/attachments/149/149431-8dc9ba92c687ff9c35da7b6b7472fac4.jpg)
- 4pcs - EG4 8K inverters in split phase parallel configuration
- 47KWp per system. 4 strings of 8x370W panels (Isc_11.6A, Voc_41.5V, Pmax_373W, Imax_10.8A, Vmp_34.2V), per inverter.
- 16/24pcs Polarium 48V 100AH NMC batteries (common bank for all inverters)
![1684252788060.png 1684252788060.png](https://diysolarforum.com/data/attachments/149/149431-8dc9ba92c687ff9c35da7b6b7472fac4.jpg)
- I would like some assistance with figuring out how to get the battery percentage to show correctly in the app/online.
- I would like to configure the LOAD1 "low voltage disconnect" parameter
- Also, the LOAD2 "low voltage disconnect" parameter.