I am setting up a Voltronic MKS iv 5.6kw (3 phase 220V house in greece) and i am trying to make a schemantic of the ac panel that will feed the AC in and return the AC out to the critical loads panel on the house.
Does it matter if i do picture 1 or picture 2?
In picture 2 i use a 3p changeover switch that will also switch the ground. ( not sure if this is stupid!)
Was thinking that if grid is down it may matter.
Picture 1
Picture 2
Another question
Should i put another 2P 25A AC MCB in the inverter output before the Changeover switch?
I suppose it would be more convenient and some added safety.
Does it matter if i do picture 1 or picture 2?
In picture 2 i use a 3p changeover switch that will also switch the ground. ( not sure if this is stupid!)
Was thinking that if grid is down it may matter.
Picture 1
Picture 2
Another question
Should i put another 2P 25A AC MCB in the inverter output before the Changeover switch?
I suppose it would be more convenient and some added safety.