My DC coupled system have about 7.9 kw pv for two schneider mppt 60-150 that generates about 6.5 kw ( 120 amps x 54.4 volts). I have a xw6848pro at fw 1.11 and a Gateway at fw 1.17. When i was in grid support-zero sell mode the system charges the battery to full 54.4 volts, no matter the GSV setting so at dark it started to supply my loads from the battery until hitting GSV. That was perfect operation.
My problem began when i started net-metering and modify selling to grid setting. I set it to 25 amps at 240 volts (5.76 kw) max sell. Since i am open loop i set GSV to 0.5 volts below mppt's float setting. It started selling right away. But, if i change the GSV for example to 52.8 volt from 54.2 v it just charge the battery until getting to GSV, not fully charging it. The mppts were in bulk mode all of this time. The system keeps on selling to grid almost everything produced but does not charge to full the battery. Is that the correct way for the system to respond. Thanks for any insight. !!!
My problem began when i started net-metering and modify selling to grid setting. I set it to 25 amps at 240 volts (5.76 kw) max sell. Since i am open loop i set GSV to 0.5 volts below mppt's float setting. It started selling right away. But, if i change the GSV for example to 52.8 volt from 54.2 v it just charge the battery until getting to GSV, not fully charging it. The mppts were in bulk mode all of this time. The system keeps on selling to grid almost everything produced but does not charge to full the battery. Is that the correct way for the system to respond. Thanks for any insight. !!!