ramseyjack
been around a day or two
Been doing this a long time, and purchased a couple of EG4 6500 EX-48's when they first came out for an emergency backup when one of my customers Outbacks fail (great product line but after about 7-10 years you better have a lot of spares on hand for parts supply is sometimes a long wait). So I just had to dust off the boxes and get them up and running on the test bench today. Loaded new firmware in both the EG4 Lifepower batteries and the inverter, everything talking, configured for split phase (2 inverters) and even got the Watchpower wireless app working. (much nicer serial app, but I don't have the inverter unlock password to make remote changes). Crude but not remote friendly (I keep solid state PC's and whatever needed software loaded for the first couple of months on customer sites when trying new devices).
Long story short all working but cannot find a single reference to anyone using the dry contact to start a generator with the EG4 6500 EX-48. This is not an option, really have to enable this feature.
I have searched in all the regular places, with no matches, but thought someone here had one working. I'll take a rest and look when my head is a little clearer.
Thanks for everything,
Jack
Long story short all working but cannot find a single reference to anyone using the dry contact to start a generator with the EG4 6500 EX-48. This is not an option, really have to enable this feature.
I have searched in all the regular places, with no matches, but thought someone here had one working. I'll take a rest and look when my head is a little clearer.
Thanks for everything,
Jack