boondox
Chief Engineer, RedNeckTech Industries
- Joined
- Mar 1, 2020
- Messages
- 788
I am going down to the high desert in San Diego county this week to help my step son get the footings ready for a 6kW ground mount array. Class c soil I think. They want 12 * 2' diameter, 3' 6" deep holes with 2 inch schedule 40 galvanized pipe for the footings. That comes out to 5+ yards of concrete. Seems like over kill to me. But it will be fun, we are renting a skid steer with an auger. Taking the van and plenty of beer. Should be good times. But jeez, that is a lot of concrete!