Murphyslaww
New Member
We have 5 ecoworthy 18" actuators now left over from upgrading our truck charger project to Progressive Automations actuators. They may be too long. We'll see. The originals are 12"
Should get installed in the shed with both sides done by around march, to achieve our goal of 7.5kW/Day out of the Shed's 1200 watts of panels by this summer.
Should get installed in the shed with both sides done by around march, to achieve our goal of 7.5kW/Day out of the Shed's 1200 watts of panels by this summer.
Last edited: