Chewy
New Member
I am a retired industrial control electrician. I am planning on installing a hybrid 15 K PV ground mount array on my property. I would like to put the inverters in my barn which is about 150 feet from where the array would sit. I don’t plan on putting batteries in initially however, I do plan on installing them down the road. I consider myself to be a very skilled electrician/fabricator/installer. However, the part that I would like some advice hopefully from someone who has gone through the whole process. I have done some reading on Pacific Powers website as well as the Oregon building code website. I think I understand most of it, but it would be comforting to talk to someone who’s been there done that. Thank you.