Dan_Austin
New Member
One of the joys of living in a small town, even if there is a licensed trade in town, they're likely too busy to take on a small job.
I am installing a EG4 18Kpv. It will be replacing/augmenting a SolarEdge inverter.
The small Eaton disconnect is to be removed. I was thinking to use a 200A fused disconnect to the right side of the panel running conduit up and over the panel and enter the wireway to the left of the Eaton, but could be talked into a manual transfer switch. All reasonable rates & trip charges considered,
I am installing a EG4 18Kpv. It will be replacing/augmenting a SolarEdge inverter.
The small Eaton disconnect is to be removed. I was thinking to use a 200A fused disconnect to the right side of the panel running conduit up and over the panel and enter the wireway to the left of the Eaton, but could be talked into a manual transfer switch. All reasonable rates & trip charges considered,