Hey, anyone interested in checking my work or giving any advice on this? I'm updating a preexisting system that is at a cabin I wont be at for a few weeks, but need to get my power set up pretty soon after arriving. The Inverters are up there. I have a manual that I've been going through to be prepared to work with them. Last I knew they were operational. The turbine and power station were operational and charging the batteries as late as October 2020, but it froze up in December and will need to be brought down and fixed at some point.
I've got the panels waiting for me and am about to order the charge controller, batteries, cables and fuses! Very excited to get this up and running.