One of the main factors (to me) in the solar equation is the cost of installation for a grid-tied system. Since FL requires these systems to be installed by a licensed contractor, is it realistic to think I can save money purchasing a kit system and hiring the installation?
For example - this seems a reasonable price ($15k +/-) but how much should I expect to have to pay for installation?
For example - this seems a reasonable price ($15k +/-) but how much should I expect to have to pay for installation?