dougbert
Solar Addict
Refactored the battery pack today, 2 shelves with 3 rows of 2 modules each now neatly aligned AND connected to the bus bar and running
Got the NEG bar heat shrunk and installed
Here are the NEG taps, one for each of the current 2 shelves, one tap for each 3 rows together. Eventually 4 taps per NEG and 4 per POS bar distributing the electron flow
Same for the POS bar, 2 taps for 2 shelves. Lower one is the POS contact for the ESP 32 BMC. The BMC's NEG tap is on the top of the NEG bar
Pic with the raceway covers in place. POS view
NEG view
and FINALLY
with the plexy glass shield re-installed
I am also FINALLY happy with the way it is setup, protected and configured
Should not have to touch it again until the next set of modules are ordered and arrive
This is 60 kw-hours on those 2 shelves. Amazing the energy density of the Tesla modules
so, this is 1/2 of the full potential of battery capacity I could/will have some time in the future
Got the NEG bar heat shrunk and installed
Here are the NEG taps, one for each of the current 2 shelves, one tap for each 3 rows together. Eventually 4 taps per NEG and 4 per POS bar distributing the electron flow
Same for the POS bar, 2 taps for 2 shelves. Lower one is the POS contact for the ESP 32 BMC. The BMC's NEG tap is on the top of the NEG bar
Pic with the raceway covers in place. POS view
NEG view
and FINALLY
with the plexy glass shield re-installed
I am also FINALLY happy with the way it is setup, protected and configured
Should not have to touch it again until the next set of modules are ordered and arrive
This is 60 kw-hours on those 2 shelves. Amazing the energy density of the Tesla modules
so, this is 1/2 of the full potential of battery capacity I could/will have some time in the future