Bigbluecat57
New Member
I'm considering buying a PowMr 10k SunSmart Hybrid Solar controller. I would connect it to a manual transfer switch in my shed so I still have my utility company power and my solar system to alternatively send power to my garage 200 amp breaker box to power a 240v mini split and 120v refrigerator plus some computers and lights. Load requirements aside. Do you see any problems with my proposed setup. My utility company says I have single phase but I don't intend to ever grid tie.