RV10flyer
Solar Wizard
- Joined
- Mar 8, 2021
- Messages
- 1,198
I needed 60-80kWh/daily. Two 12K, 20,640W pv, 143kWh LFE and 10kW Honeywell LP Gen did the trick. Off-grid completely for five months. Power shed cooled to 68-75F with my Fujitsu 9K 33 SEER. No problems other than learning the proper settings and a bad wifi dongle. Sol-Ark has excellent customer service. That is very hard to find nowadays. I'm happy to pay extra for the 10 yr warranty and good customer service. I'm waiting on SS receive their next load, so they can ship my two EG4 6.5's. They'll be in my shop and cooled too. So will see how they do in comparison.
Edit: 8/25/22...my two 12K's shut down yesterday when I pulled the trigger on my Dewalt circular saw. I tested my hospital grade Tripplite 2000W backup power supply/inverter with 48V 9aH (4 SLA in series) and 120vac 16A pass thru, filtered. It started right up. Hooked up my new EG4 6500ex, it started right up. Moved the saw 200’ away from power shed and it worked fine with steady readings on the 12k. Sorry I can’t explain it.
Edit: 8/25/22...my two 12K's shut down yesterday when I pulled the trigger on my Dewalt circular saw. I tested my hospital grade Tripplite 2000W backup power supply/inverter with 48V 9aH (4 SLA in series) and 120vac 16A pass thru, filtered. It started right up. Hooked up my new EG4 6500ex, it started right up. Moved the saw 200’ away from power shed and it worked fine with steady readings on the 12k. Sorry I can’t explain it.
Last edited: