This forum along with some EG4 personnel has helped!
1. How would you connect (2) 18KPVs to (1) PowerWall? Is it simply using the extra battery outputs on the PowerWall and connecting to the “slave” 18KPV in addition to the “master” 18KPV?
Should I purchase anything extra (bus bars?) or are the two sets of outputs enough from the (1) PowerWall. I do plan on purchasing another PowerWall but at this time one will have to due for my 2x 18KPV 3 Phase 208V/120V setup
2. I am also installing 20 x Silfab Solar 380W Mono Solar Panel (Black) SL-380 HC. Would it be better to divide the strings to 2 sets @ 10 to “slave” and 10 to “master” or all 20 panels to the “master” in series?
1. How would you connect (2) 18KPVs to (1) PowerWall? Is it simply using the extra battery outputs on the PowerWall and connecting to the “slave” 18KPV in addition to the “master” 18KPV?
Should I purchase anything extra (bus bars?) or are the two sets of outputs enough from the (1) PowerWall. I do plan on purchasing another PowerWall but at this time one will have to due for my 2x 18KPV 3 Phase 208V/120V setup
2. I am also installing 20 x Silfab Solar 380W Mono Solar Panel (Black) SL-380 HC. Would it be better to divide the strings to 2 sets @ 10 to “slave” and 10 to “master” or all 20 panels to the “master” in series?