Maintenance guy
New Member
Wow what a system and great pics. i am so drooling profusely.
Cells are running around 58 ah testing so your monster system is at 928 ah @ 48 volts capable of pushing 1760 amp @ 48 volts @ over 7000 bucks for the cells alone. i think i just peed on myself.
One of the most professional jobs i have seen, hats of to ya !
Cells are running around 58 ah testing so your monster system is at 928 ah @ 48 volts capable of pushing 1760 amp @ 48 volts @ over 7000 bucks for the cells alone. i think i just peed on myself.
One of the most professional jobs i have seen, hats of to ya !