MuscleBiplane
New Member
- Joined
- Nov 7, 2020
- Messages
- 1
In Northern Nevada where we are there is a serious need for Serge-Jolt protection and running through a battery backup system. A generator or battery backup is too slow to switch over. We would like to see a battery system that we could run through continuously that could drop the power company linkage when necessary. Solar or grid charging would be fine but not desired as primary. Is there a system or video out there that addresses this topic? I know Will would have some ideas or solutions.