I am getting my first Solar system installed Monday.
It comprises a Sunsynk Hybrid bi-directional inverter and Synsynk 5.12kWh battery driven by 11 x JA Solar 385W panels on my roof.
I read quite a lot about these inverters before choosing this system as they seem quite flexible. I also watched CEO Keith Gough's very informative videos on YouTube.
Apart from saving the planet my main motivation now is reducing import at the scary unit prices, even at the new (UK) capped rate of 34p per unit
A secondary reason is that during Storm Arwen in November last year some places in Scotland had outtages of up to 10 days, so I want to have some crucial systems kept running from the battery, for as long as possible.
The issue is that my supplier is intimating that I cannot set it up this for operation during a grid outtage. I can't see why, if I
Use my 2-pole isolator to completely off-grid the system
Get a new split consumer unit to separate critical loads
Use my generator or UPS to energise the system
Then set it up to draw from the battery.
Can someone edicate this newby about what is possible or not, please?
Regards
Andrew
It comprises a Sunsynk Hybrid bi-directional inverter and Synsynk 5.12kWh battery driven by 11 x JA Solar 385W panels on my roof.
I read quite a lot about these inverters before choosing this system as they seem quite flexible. I also watched CEO Keith Gough's very informative videos on YouTube.
Apart from saving the planet my main motivation now is reducing import at the scary unit prices, even at the new (UK) capped rate of 34p per unit
A secondary reason is that during Storm Arwen in November last year some places in Scotland had outtages of up to 10 days, so I want to have some crucial systems kept running from the battery, for as long as possible.
The issue is that my supplier is intimating that I cannot set it up this for operation during a grid outtage. I can't see why, if I
Use my 2-pole isolator to completely off-grid the system
Get a new split consumer unit to separate critical loads
Use my generator or UPS to energise the system
Then set it up to draw from the battery.
Can someone edicate this newby about what is possible or not, please?