Aloha all from Hawaii, new to solar but relatively familiar with electrical. Been researching and documenting based on the very informative site and wanted a second set of eyes to confirm this setup is on par, appreciate all!
1. This will be an OFF grid set up only to power a distribution panel for 120v appliances.
2. 10 panels in series were installed and power is confirmed with the inverter.
3. (3) batteries will be added, however awaiting the proper mounting rack to arrive, shipping delay.
I have soft installed but have not yet ran wiring from output of inverter to the panel with breaker. Was reading that the similar model of EG4 has a unique setup for the N-G and wanted to confirm or simply ask what wiring diagram will work, e.g. just the Load from the inverter out to the breaker, with a jumper to power both legs, or another recommended option.
I appreciate any and all replies toward this setup, and thank you all.
1. This will be an OFF grid set up only to power a distribution panel for 120v appliances.
2. 10 panels in series were installed and power is confirmed with the inverter.
3. (3) batteries will be added, however awaiting the proper mounting rack to arrive, shipping delay.
I have soft installed but have not yet ran wiring from output of inverter to the panel with breaker. Was reading that the similar model of EG4 has a unique setup for the N-G and wanted to confirm or simply ask what wiring diagram will work, e.g. just the Load from the inverter out to the breaker, with a jumper to power both legs, or another recommended option.
I appreciate any and all replies toward this setup, and thank you all.