Emailed Sunsynk but no answer yet so trying for experiences from here…..
1 how do I limit export to grid? I can see setting fur limit to load+grid but not just grid. DNO has given me a limit so how do I ensure I don’t go over it?
2 want to use solar to run loads first then charge battery. Want to ensure batteries fully charged up overnight then run house loads from 8am to 10pm if enough power; if not enough then battery until 40%, then grid, with battery/solar export 4-7pm until battery 20%. Is this achievable?
1 how do I limit export to grid? I can see setting fur limit to load+grid but not just grid. DNO has given me a limit so how do I ensure I don’t go over it?
2 want to use solar to run loads first then charge battery. Want to ensure batteries fully charged up overnight then run house loads from 8am to 10pm if enough power; if not enough then battery until 40%, then grid, with battery/solar export 4-7pm until battery 20%. Is this achievable?