fafrd: one more please! Assumptions: a house with options for panels oriented in multiple directions, >100kwh batteries already on site that can be set up as 24 or 48 volt, wiring already separated into multiple panels whereby one all 240 loads are in one panel, and other panels are set up according to priority. A 3000va Quattro on site. The only 240 load that is important is mini-splits, but not crucial. Lots of smaller term power outages. Most energy consumed during the day, not at night. Very cold winters, biggest worry is power outages during super cold temps.
Our place is set up in wings, with one dedicated for a future live-in area for a relative, if needed. Main source of heat is natural gas. No time of day metering here.
I prefer backups to backups.
Opinions? THX!
Our place is set up in wings, with one dedicated for a future live-in area for a relative, if needed. Main source of heat is natural gas. No time of day metering here.
I prefer backups to backups.
Opinions? THX!