alvirtuoso
New Member
- Joined
- Sep 28, 2021
- Messages
- 81
Hello! Kindly review my Offgrid system design:
Growatt 12kw with batrium bms, 2P16S LiFePo 302ah by EVE
Growatt 12kw with batrium bms, 2P16S LiFePo 302ah by EVE
- only load is 4ton HVAC with EasyStart which helps amp in-rush.
- battery bank is charged by Growatt(40a charging) and Chargeverter(30a charging)
- Remote port On/Off switch toggled by batrium relay1 upon critical state
- only load is chargeverter @ 120v
- Set to 30a charging
- On/off by a shunt trip breaker(ac/dc rated). Batrium's relay2 trips breaker upon critical state.
- Source Input 1: Growatt . NG bonded in the switch.
- Source Input 2: Utility . NG bond in the utility main panel box.
- Output to HVAC(only load).