Hedges
I See Electromagnetic Fields!
- Joined
- Mar 28, 2020
- Messages
- 20,879
Adding battery storage for on-grid use with GT PV is important, as net metering gets killed off.
Backup performance, including starting A/C or well pump, is important.
Motor starting surge. Amps, and quote in terms of motor and A/C size it can start.
Continuous output.
Both when near full, and when near empty.
AC coupling with GT PV "Rule-21" inverters.
Behavior modulating PV production when PV exceeds loads and varies.
Load-dump response when large load suddenly shuts off while fully charged. e.g. with 7.6kW of PV and fully charged, power a 7.6kW load then shut it off. See if AC continues to be produced without glitching or shutting off.
Backup performance, including starting A/C or well pump, is important.
Motor starting surge. Amps, and quote in terms of motor and A/C size it can start.
Continuous output.
Both when near full, and when near empty.
AC coupling with GT PV "Rule-21" inverters.
Behavior modulating PV production when PV exceeds loads and varies.
Load-dump response when large load suddenly shuts off while fully charged. e.g. with 7.6kW of PV and fully charged, power a 7.6kW load then shut it off. See if AC continues to be produced without glitching or shutting off.