I'm planning a DIY grid-tie roof-top solar power system with battery backup. I'm trying to apply for interconnection ASAP so I can secure NEM 2.0 before the deadline. I'm exploring the PGE interconnection application form and I cannot answer the following question:
"How do you plan to limit export?"
Options:
* Power Control System (Option 10)
* Relay (Option 1)
* Derated Inverter
Screenshot attached.
Do I even want to limit export? I figured that would be true when the batteries are charging or if I were time-shifting.