Frustrated in central Florida.
Just spent days redoing vertical battery orientation of 17 cells in one bank, into three banks for a total of 51 cells, all neatly arranged horizontally. Largest 8x8", square surface down. And up on the adjacent cells, terminal all on one side with the busbars. Have three BMS units and wiring to boot. Really don't want to tear apart for a third time. For now I will wait as everything is really floating at 90%, no cycling on a daily basis, just standby power.
Just spent days redoing vertical battery orientation of 17 cells in one bank, into three banks for a total of 51 cells, all neatly arranged horizontally. Largest 8x8", square surface down. And up on the adjacent cells, terminal all on one side with the busbars. Have three BMS units and wiring to boot. Really don't want to tear apart for a third time. For now I will wait as everything is really floating at 90%, no cycling on a daily basis, just standby power.