Watch Me Build
New Member
- Joined
- Jul 4, 2020
- Messages
- 98
here's the specs on the panel. Trying to do s2p6 into the combiner box. So 12 panels total.
The run from the combiner box to the PIP 3048LV-MK is 30 ft. Can I get away with 6awg wire? And what's the most cost effective wire I can go with when running through underground conduit?
Also what gauge wire from the panels to the combiner box?
The run from the combiner box to the PIP 3048LV-MK is 30 ft. Can I get away with 6awg wire? And what's the most cost effective wire I can go with when running through underground conduit?
Also what gauge wire from the panels to the combiner box?