Ordered EVE 230ah cells from Docan. They have threaded posts welded on with a square base, and are only welded on 2 sides. Some of them I can see light underneath, so they are not sitting flush. Two little welds isn't a lot of metal. Is it enough for 1C+ discharge rates?