We had a vendor bid Solar and battery back up. Solar has been installed. We have two meters, each with 100 kw generators for back up. Our arrays are 21 kw. When the vendor showed up to install the battery back up the wheels came off the bus. It was clear they had under bid they system due to there lack of knowledge of our on-site electrical needs.
We now need to start over on the battery portion of the build. We are grid tied currently, we are in a remote area with single phase power provided by a small power cooperative in North Central Idaho. We had been sold two 30 kw battery systems one for each solar array located at each meter. The vendor stated that our potential load would require a much larger system after arriving to install his product.
We now need to start over on the battery portion of the build. We are grid tied currently, we are in a remote area with single phase power provided by a small power cooperative in North Central Idaho. We had been sold two 30 kw battery systems one for each solar array located at each meter. The vendor stated that our potential load would require a much larger system after arriving to install his product.