Conduit will happen after I find out the final configuration....I have 150 feet of service drop to bury, and then final wiring of the sub-panel. So this generator thing is a real distraction. I literally need to be stuffing wires in pipes not screwing around with something that should have been simple.That's the typical way of marking the neutral.
And meets code for #4 and larger conductors.
I would be more concerned that those conductors are not protected in conduit. But maybe that's just temporary.