shotfirst001
New Member
Hi,
I have an ecoflow delta 2 max connected to a generator transfer box through the 3-prong inlet. I hear that I need to bond the neutral and ground together in the transfer box to resolve the open ground error when I test the first outlet on the load.
This is where I get confused...and hoping to get some feedback.
If I splice neutral and ground together in the transfer box where does that go into the outlet where I need 3 wires; hot, ground, neutral when I have hot and a bonded ground+neutral.
Surely, I'm missing something...
I have an ecoflow delta 2 max connected to a generator transfer box through the 3-prong inlet. I hear that I need to bond the neutral and ground together in the transfer box to resolve the open ground error when I test the first outlet on the load.
This is where I get confused...and hoping to get some feedback.
If I splice neutral and ground together in the transfer box where does that go into the outlet where I need 3 wires; hot, ground, neutral when I have hot and a bonded ground+neutral.
Surely, I'm missing something...