Old_Skewler
Solar Enthusiast
My setup is the following:
- (1) Growatt 8kW DVM-MPV, Split Phase
- (1) 12kW Gas Generator, Split Phase
- Grounding bonded to neutral at main cabin panel
- Inverter, Battery + Generator installed on exterior shed
Here is a photo of the equipment in the shed:
The issue I currently have is regarding how to exactly wire the Generator -> Inverter with regards to the ground + neutral wiring: the generator output has L1+L2+G+N.
The AC input on the Inverter only has L1+L2+Ground(?). The manual does not even offer a wiring diagram from split phase.
Additionally, i have an extra ground wire from the AC Output to the new subpanel that I don't know where to wire it to.
See photo below:
- (1) Growatt 8kW DVM-MPV, Split Phase
- (1) 12kW Gas Generator, Split Phase
- Grounding bonded to neutral at main cabin panel
- Inverter, Battery + Generator installed on exterior shed
Here is a photo of the equipment in the shed:
The issue I currently have is regarding how to exactly wire the Generator -> Inverter with regards to the ground + neutral wiring: the generator output has L1+L2+G+N.
The AC input on the Inverter only has L1+L2+Ground(?). The manual does not even offer a wiring diagram from split phase.
Additionally, i have an extra ground wire from the AC Output to the new subpanel that I don't know where to wire it to.
See photo below: