Piece of cake baby! I was commissioning (we called it doing a startup) a new double ended utilty swbd (with 24 feeder breakers on each side) and a 3 gen swbd. This was in Weston, FL, Amex facility. The electricians told me the city electrical inspector made them remove all of the future equipment placements from the drawings. I asked them if the inspector was from NY or NJ? They said NY, had to one of those two. So a cpuple of days later they said the inspector had some questions. I was pretty busy but went in to see what he wanted. He started asking questions about how this worked and how this worked, a bunch stupid shit. I just looked at him and said I'm busy, you don't need to know any of that stuff. Your job is to ensure it's installed per code. If you're just curious come back when I have time and I'll be happy to satisfy your curiousity. Then I walked out. Never saw him again. The electrical contractor foreman told me later that he couldn't believe I told him that. I lived on Long Isand for for 2 1/2 years and don't put up with their BS.