Seeming taking forever but unfortunately is as time permits. Have Solar panels and wiring figured out, have battery bank figured out. And for the most part have the input worked out (at least for initial implementation). Issue and details for output and wiring, i.e., the two EG4 3k units in parallel, singe phase 120V.
design concept:
1) 10/3 wiring for output, from each inverters, to sub panel 2... considering 4-6 slot small panel box.
2) use two 30A breakers for incoming power, each sending 120V, 3000w // 25A.
3) available then is 120V, 6000w // 50A single phase at sub spanel 2.
4) out going to include:
4.1 - 30A breaker line to existing distribution center.
4.2 - 20A breaker line to sub panel 1.
Thoughts are that since I already have the 30A distribution center, but also a sub-panel (prepped for inverter but not completed, labeliing that sub-panel 1.) I could wire 120V 30A to main, 20A to sub panel, along with split off some things to sub-panel 1 like 2nd Air Conditioner and Microwave, perhaps garage plug ins (my office).
Appreciate input.
design concept:
1) 10/3 wiring for output, from each inverters, to sub panel 2... considering 4-6 slot small panel box.
2) use two 30A breakers for incoming power, each sending 120V, 3000w // 25A.
3) available then is 120V, 6000w // 50A single phase at sub spanel 2.
4) out going to include:
4.1 - 30A breaker line to existing distribution center.
4.2 - 20A breaker line to sub panel 1.
Thoughts are that since I already have the 30A distribution center, but also a sub-panel (prepped for inverter but not completed, labeliing that sub-panel 1.) I could wire 120V 30A to main, 20A to sub panel, along with split off some things to sub-panel 1 like 2nd Air Conditioner and Microwave, perhaps garage plug ins (my office).
Appreciate input.