Bluedog225
Texas
- Joined
- Nov 18, 2019
- Messages
- 2,956
I’m going to have my main panel in the conex with the inverter and batteries. And a sub panel in the cabin.
The conex part is decided. Even if not up to code. No inspections out in the country where I am located.
What are the rules regarding clearance and access? And can I put the sub panel in a small room. Sort of a tornado/fire shelter in the cabin. Not a clothes closet. It seems the sensible place. And frankly, I’m running out of wall space in the garage. My other location would be under a set of stairs.
Or is having the sub panel in a smaller locked room a bad idea?
I don’t have a problem following code if it makes sense.
many thanks
The conex part is decided. Even if not up to code. No inspections out in the country where I am located.
What are the rules regarding clearance and access? And can I put the sub panel in a small room. Sort of a tornado/fire shelter in the cabin. Not a clothes closet. It seems the sensible place. And frankly, I’m running out of wall space in the garage. My other location would be under a set of stairs.
Or is having the sub panel in a smaller locked room a bad idea?
I don’t have a problem following code if it makes sense.
many thanks