I don't think that the solution is any different. But the situation becomes mute, in some cases.
As with a metal secondary building in full contact with the earth.
Then the decision on an auxiliary ground rod doesn't matter.
At that point, the best thing to do. Is run a GEC. Instead of an EGC.
As with a metal secondary building in full contact with the earth.
Then the decision on an auxiliary ground rod doesn't matter.